TVS Motors Limited
1,60,000 Sqft.
Supply and erection of precast elements for warehouse mazzanine floor for phase 1 & 2.
Rs. 950 lacs
90 days (Dec 2013 – Feb 2014)
Hosur, 285 Kms
Additional space of mezzanine floor of 1,10,000 sq.ft. for the existing steel warehouse building was done using precast. with very little space for crane movement keeping the existing building erection was successfully carried out.
200 mm Hollow Core Slabs of 10m long used as roof slabs, precast RCC columns, pre tensioned beams. All the columns & beams are connected in bolt & net connection with existing steel structure.
WhatsApp us