Client: Ganesan Builders, MAC Cricket stadium 6000Rm of gallery steps
Project Size: 6,000 Rm
Type : Gallery Steps
Value : Rs. 250 lacs
Duration : 45 days
Location : Chennai
Highlight : In the original design rise and tread were designed as separate elements, to reduce the number of joints and to speed up the erection process alternate design was suggested by us to make two rise and tread together as one piece. Our design was accepted and we supplied the gallery steps within a short duration of 45days and the same was erected within the stipulated time before the world cup match.